2018
DOI: 10.24284/jkosur.2018.09.6.3.139
|View full text |Cite
|
Sign up to set email alerts
|

Optimum Design Section of Non-open Cut Underpass Construction Method, Super Equilibrium Method(SEM) by Numerical Analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The non-open-cut method is generally used for construction under the condition of weak ground stiffness, such as on weathered soil. In this study, the properties of the ground were determined, as presented in Table 4, by averaging the properties of the ground acquired from other studies that have applied the non-open-cut method [9][10][11][12]. The specification of the pile was determined based on the method suggested by Kim [13].…”
Section: Overview Of Model Testmentioning
confidence: 99%
“…The non-open-cut method is generally used for construction under the condition of weak ground stiffness, such as on weathered soil. In this study, the properties of the ground were determined, as presented in Table 4, by averaging the properties of the ground acquired from other studies that have applied the non-open-cut method [9][10][11][12]. The specification of the pile was determined based on the method suggested by Kim [13].…”
Section: Overview Of Model Testmentioning
confidence: 99%