TENCON 2017 - 2017 IEEE Region 10 Conference 2017
DOI: 10.1109/tencon.2017.8228087
|View full text |Cite
|
Sign up to set email alerts
|

Optimum long-term planning for microgrid

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(1 citation statement)
references
References 24 publications
0
1
0
Order By: Relevance
“…Development of planning models considering a long-term analysis horizon, with hourly resolution of the data. Some planning works include the use of data samples with hourly load and generation resolution, with which they seek to represent annual meteorological conditions, in time windows of weeks of a month, or even a typical day [30][31][32]. Using this type of representation of the study horizon, the results could be extended to a full year (365 days), while the calculation time of the optimization problem is considerably reduced [33].…”
mentioning
confidence: 99%
“…Development of planning models considering a long-term analysis horizon, with hourly resolution of the data. Some planning works include the use of data samples with hourly load and generation resolution, with which they seek to represent annual meteorological conditions, in time windows of weeks of a month, or even a typical day [30][31][32]. Using this type of representation of the study horizon, the results could be extended to a full year (365 days), while the calculation time of the optimization problem is considerably reduced [33].…”
mentioning
confidence: 99%