2016
DOI: 10.15407/mining10.02.078
|View full text |Cite
|
Sign up to set email alerts
|

Organization of dumping stations with combined transport types in iron ore deposits mining

Abstract: Purpose. To develop the methodology for selecting appropriate type of open-pit transport in conditions of mining sinking to the maximum depth of opencast mining. Findings. The proposed optimization of dumping stations placement with combined operation of automobile and railway vehicles allows to exclude utilization of dumping excavators. The efficiency of dumping stations building of block structures is confirmed which allows to decrease total number of dump trucks by 20 -30% for the average rock transportatio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0
4

Year Published

2016
2016
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 15 publications
(11 citation statements)
references
References 6 publications
0
7
0
4
Order By: Relevance
“…Much attention is given to research of the mining equipment structural characteristics influence on the effectiveness of the quality management of non-metallic building materials; thus, the paper (Nenashev, A.S., Fedotenko, V.S., 2011) investigates the influence of bucket capacity and a technological scheme on the performance of excavation of a rock mass; but a mathematical model of the rock mass excavation process of a backhoe type excavator to estimate a layer, which is separated by scooping, and the filling ratio of the bucket at different points of the excavator slaughter is developed in the paper (Strelnikov, A.V., Tioulenev, M.A., 2011); while the optimal geometric dimensions of the bucket are proven and the efficiency of a backhoe type excavator when using buckets of various sizes is investigated in the research (Komissarov, A.P., et al, 2006;Pobegailo P.А., 2014). Intensification of technological processes in drilling and blasting operations during open-cut mining and organization of dumping stations with combined transport types are investigated in the publication (Zairov, Sh., et al, 2018;Abdellah, W.R., et al, 2018;Sobko, B., et al, 2017;Shustov, О., Dryzhenko, А., 2016).…”
Section: Literature Data Analysis and Target Settingmentioning
confidence: 99%
“…Much attention is given to research of the mining equipment structural characteristics influence on the effectiveness of the quality management of non-metallic building materials; thus, the paper (Nenashev, A.S., Fedotenko, V.S., 2011) investigates the influence of bucket capacity and a technological scheme on the performance of excavation of a rock mass; but a mathematical model of the rock mass excavation process of a backhoe type excavator to estimate a layer, which is separated by scooping, and the filling ratio of the bucket at different points of the excavator slaughter is developed in the paper (Strelnikov, A.V., Tioulenev, M.A., 2011); while the optimal geometric dimensions of the bucket are proven and the efficiency of a backhoe type excavator when using buckets of various sizes is investigated in the research (Komissarov, A.P., et al, 2006;Pobegailo P.А., 2014). Intensification of technological processes in drilling and blasting operations during open-cut mining and organization of dumping stations with combined transport types are investigated in the publication (Zairov, Sh., et al, 2018;Abdellah, W.R., et al, 2018;Sobko, B., et al, 2017;Shustov, О., Dryzhenko, А., 2016).…”
Section: Literature Data Analysis and Target Settingmentioning
confidence: 99%
“…Витрати на транспортування гірничої маси автосамоскидами більші, ніж конвеєрним підйомником [3]. Тому для ефективного використання комбінованого авто-мобільно-конвеєрного транспорту горизонт встановлення перевантажувального пункту необхідно з часом переносити вглиб через кожні 90-105 м [4].…”
Section: постановка задачіunclassified
“…Дослідженнями (Simonenko, 2004;Simonenko & Gritsenko, 2014;Shustov & Dryzhenko, 2016), виконаними в Державному ВНЗ "НГУ", доведена доцільність поетапної розробки родовищ твердих нерудних корисних копалин з відпрацювання сировини крутими виймальними шарами. Зазначена технологія передбачає розподіл території кар'єрного поля на окремі етапи розробки.…”
Section: основна частинаunclassified