2023
DOI: 10.1016/j.energy.2022.126454
|View full text |Cite
|
Sign up to set email alerts
|

Parametric and heuristic optimization of multiple schemes with double-reheat ultra-supercritical steam power plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 31 publications
0
1
0
Order By: Relevance
“…The mixed bypass system uses a large bypass for the last two stages of HPFW heaters and a small bypass for the rest, which is more commonly used in 600 MW units. The advantage of the large bypass is that the system is simple, with fewer valves, and it saves investment [6]. However, a drawback is that if one HPFW heater in the system fails, all the remaining heaters in that bypass system will also be shut down.…”
Section: Introductionmentioning
confidence: 99%
“…The mixed bypass system uses a large bypass for the last two stages of HPFW heaters and a small bypass for the rest, which is more commonly used in 600 MW units. The advantage of the large bypass is that the system is simple, with fewer valves, and it saves investment [6]. However, a drawback is that if one HPFW heater in the system fails, all the remaining heaters in that bypass system will also be shut down.…”
Section: Introductionmentioning
confidence: 99%