2023
DOI: 10.1016/j.jece.2023.109618
|View full text |Cite
|
Sign up to set email alerts
|

Part I: Predicting performance of Purolite A532E resins for remediation of comingled contaminants in groundwater

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
7
0

Year Published

2023
2023
2025
2025

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(7 citation statements)
references
References 18 publications
0
7
0
Order By: Relevance
“…76 No information on A532E Tc uptakes in the same P&T system could be found, although Saslow and coworkers have recorded K d s of >19 800 mL g −1 (>99% resin uptake) in double deionised water containing 200 ppb 99 Tc. 73 This figure remained constant with NO 3 − and SO 4 2− present at concentrations up to 20 mM and 10 mM, respectively, exceeding the levels seen in P&T influent streams (1.61 and 0.60 mM for NO 3 − and SO 4 2− , respectively) between 1 st June 2021 and 30 th May 2022 (data cited in ref. 73).…”
Section: Current Treatment Methodsmentioning
confidence: 85%
See 4 more Smart Citations
“…76 No information on A532E Tc uptakes in the same P&T system could be found, although Saslow and coworkers have recorded K d s of >19 800 mL g −1 (>99% resin uptake) in double deionised water containing 200 ppb 99 Tc. 73 This figure remained constant with NO 3 − and SO 4 2− present at concentrations up to 20 mM and 10 mM, respectively, exceeding the levels seen in P&T influent streams (1.61 and 0.60 mM for NO 3 − and SO 4 2− , respectively) between 1 st June 2021 and 30 th May 2022 (data cited in ref. 73).…”
Section: Current Treatment Methodsmentioning
confidence: 85%
“…76 No information on A532E Tc uptakes in the same P&T system could be found, although Saslow and coworkers have recorded K d s of >19 800 mL g −1 (>99% resin uptake) in double deionised water containing 200 ppb 99 Tc. 73 This gure remained constant with NO 3 high degree of 99 Tc selectivity shows promise for A532E's application at site scales, there is a need for larger pilot trials to support results of simplied laboratory set ups. As the P&T system continues to operate at Hanford, future work by Saslow and coworkers will look at the performance of both A532E and DOWEX 21K with owing groundwater, and scale up models to predict the efficacy with varying P&T inuent chemistry.…”
mentioning
confidence: 95%
See 3 more Smart Citations