2020
DOI: 10.26630/rj.v14i1.2147
|View full text |Cite
|
Sign up to set email alerts
|

Penilaian Risiko Kerja Menggunakan Metode Hirarc Di Pt. Sinar Laut Indah Natar Lampung Selatan

Abstract: is a concrete manufacturing plant that has a risk of occupational accidents and occupational diseases due to exposure to particulates, use of work tools, and work methods. The purpose of this research is to find out what are the dangers in a factory, to assess the risk (risk assessment) and risk control (risk control) at each work stage using the HIRARC method. The work risk assessment uses the HIRARC method, which consists of three stages of assessment, namely hazard identification, risk assessment and risk c… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 6 publications
0
3
0
1
Order By: Relevance
“…The RPN values obtained will be sorted from the highest to the lowest RPN, indicating that the higher the RPN order, the higher the risk of work accidents. Furthermore, the risk of work accidents with the highest RPN value based on the results of the Pareto diagram, was given recommendations for improvement using the Hazard Identification Risk Assessment and Risk Control (HIRARC) related to efforts to prevent and control hazards in the Occupational Safety and Health (K3) management system (Desianna and Yushananta, 2020). Risk control in HIRARC consists of several levels, including elimination, substitution, engineering controls, administrative controls, and Personal Protective Equipment (PPE).…”
Section: Methodsmentioning
confidence: 99%
“…The RPN values obtained will be sorted from the highest to the lowest RPN, indicating that the higher the RPN order, the higher the risk of work accidents. Furthermore, the risk of work accidents with the highest RPN value based on the results of the Pareto diagram, was given recommendations for improvement using the Hazard Identification Risk Assessment and Risk Control (HIRARC) related to efforts to prevent and control hazards in the Occupational Safety and Health (K3) management system (Desianna and Yushananta, 2020). Risk control in HIRARC consists of several levels, including elimination, substitution, engineering controls, administrative controls, and Personal Protective Equipment (PPE).…”
Section: Methodsmentioning
confidence: 99%
“…The use of the likelihood of hazard method and severity of hazard can give good results good at work risk assessment (Desianna, & Yushannanta, 2020) 2. Risk Assessment:…”
Section: Methodsmentioning
confidence: 99%
“…Penelitian oleh [15]- [19] Menunjukkan bahwa HIRARC secara efektif mengidentifikasi dan mengendalikan bahaya yang dapat menyebabkan kecelakaan dengan menggunakan hierarki kontrol untuk mengurangi risiko kecelakaan kerja. Penerapan metode ini diharapkan dapat mengurangi kecelakaan kerja dan memperkuat kepatuhan terhadap peraturan keselamatan dan kesehatan kerja yang lebih ketat, yang pada akhirnya meningkatkan reputasi dan efisiensi operasional PT Mega Andalan Kalasan.…”
Section: Pendahuluanunclassified