2017
DOI: 10.20319/mijst.2017.31.2735
|View full text |Cite
|
Sign up to set email alerts
|

Performance Efficiency Analysis of Water Treatment Plants by Using McDm and Neural Network Model

Abstract: Abstract

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
4
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 15 publications
(5 citation statements)
references
References 8 publications
1
4
0
Order By: Relevance
“…Moreover, less data are utilized for comparison than other MCDM methods. Various existing works also support our result which is found by our proposed hybrid method [17,53]. Also comparison study and sensitivity analysis support our result.…”
Section: Discussionsupporting
confidence: 86%
“…Moreover, less data are utilized for comparison than other MCDM methods. Various existing works also support our result which is found by our proposed hybrid method [17,53]. Also comparison study and sensitivity analysis support our result.…”
Section: Discussionsupporting
confidence: 86%
“…Heavy metals present in industrial effluents are a source of hazardous pollutants (Agarwal et al, 2015, González et al, 2011. Increased industrial and human activities are the main reasons for the higher level of metal ions present in waste water (Saha et al, 2017). Elevated levels of nickel ions in water bodies may come from a variety of sources, such as effluents from Motor vehicles, Petroleum refining, manufacturing of Fertilizers, Steel works, Foundries, Finishing, Pulp and paper industry etc.…”
Section: Introductionmentioning
confidence: 99%
“…Another important cost parameter that is always considered for comparison is the construction cost [24], which according to the results of economic analysis, for each of the three treatment processes; the construction cost is as shown in Figure 3. The highest construction cost is allocated to the CMAS activated sludge treatment plant with a fi gure of 84,600,000 dollars, and the other two processes require approximately the same and 34 million dollars.…”
Section: Economic Analysis Was Performed After Defi Ning Threementioning
confidence: 99%