Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 12 publications
(4 citation statements)
references
References 32 publications
0
4
0
Order By: Relevance
“…Lu et al [30] Permutation FJS LU investigated permutation flow shop manufacturing cell scheduling problems with deteriorating jobs and sequence-dependent setup times under dominant machines. In the proposed models, LU made joint decisions on part families sequencing and jobs sequencing within each family.…”
Section: Ga -Paretomentioning
confidence: 99%
“…Lu et al [30] Permutation FJS LU investigated permutation flow shop manufacturing cell scheduling problems with deteriorating jobs and sequence-dependent setup times under dominant machines. In the proposed models, LU made joint decisions on part families sequencing and jobs sequencing within each family.…”
Section: Ga -Paretomentioning
confidence: 99%
“…• Mathematical approaches: This decision has been addressed mainly using search approaches (França et al, 2005;Gupta and Schaller, 2006;Lin et al, 2009bLin et al, , 2009aNeufeld et al, 2015;Schaller et al, 2000), and more recently through mixed-integer programming formulations (Costa et al, 2020;Gelogullari and Logendran, 2010;Keshavarz et al, 2019Keshavarz et al, , 2014Lu et al, 2021; Universidad EIA / Rev.EIA.Univ.EIA Naderi and Salmasi, 2012;Salmasi et al, 2011Salmasi et al, , 2010Yazdani Sabouni and Logendran, 2018;Ying et al, 2012). No simulation approach was found for the problem in the literature reviewed.…”
Section: Flowshop Group Scheduling Approachesmentioning
confidence: 99%
“…This phenomenon is called the deteriorating effects and the actual processing time of the job depends on its starting time or its position in the sequence [3]. This situation appears in many real-world applications, e.g., firefighting, maintenance planning, medical procedures, steel production, and lathing process [4,5]. The time and effort to cease fire will increase if there exists a delay in starting the fire-fighting operations.…”
Section: Introductionmentioning
confidence: 99%
“…There is an interest in the literature to study the scheduling problems with deteriorating jobs, formulated numerous models with various criteria and solved by branch and bound (B&B), heuristic, and metaheuristic algorithms [4][5][6][7][8][9][10][11]. Flowshop scheduling problems have received increasing attention in recent years by various assumptions [12][13][14][15][16][17].…”
Section: Introductionmentioning
confidence: 99%