2014
DOI: 10.1201/b17526
|View full text |Cite
|
Sign up to set email alerts
|

Pile Design and Construction Practice

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

3
85
0
17

Year Published

2016
2016
2020
2020

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 133 publications
(105 citation statements)
references
References 0 publications
3
85
0
17
Order By: Relevance
“…One real-world building was considered: The 31-story building of the Hyde Park Cavalry Barracks founded on clay (Figure 15.5; Tomlinson and Woodward, 2008), in London. The building is 90 m tall and its weight was calculated to be 228 MN.…”
Section: Case Studymentioning
confidence: 99%
“…One real-world building was considered: The 31-story building of the Hyde Park Cavalry Barracks founded on clay (Figure 15.5; Tomlinson and Woodward, 2008), in London. The building is 90 m tall and its weight was calculated to be 228 MN.…”
Section: Case Studymentioning
confidence: 99%
“…The soil specimens used in this research are designated as C 0 (intact soil) and C 1 , C 2 , C 3 , and C 4 are the contaminated soil samples with 10, 20, 40 and 100 % of industrial wastewater respectively. The pile used in this work of L/D ≥ 20 is classified as long and flexible and free-head piles [15]. Also, two ratios of eccentricity to length (e/L = 0.25 and 0.5) have been studied.…”
Section: Methodsmentioning
confidence: 99%
“…The description of details can refer to the classic textbook [4]. For analysing computer model, The global analysis software for approach bridge is adopted.…”
Section: Research Principlementioning
confidence: 99%