2013
DOI: 10.3846/13923730.2013.793608
|View full text |Cite|
|
Sign up to set email alerts
|

Planning of Tunneling Projects Using Computer Simulation and Fuzzy Decision Making

Abstract: Tunnel construction is one of the important infrastructure projects, which is vital for enhancing the transportation networks, especially in congested cities. Tunnel projects are characterized by long durations, large budgets, complexities, repetitive construction tasks, risks, and uncertainties. Several construction techniques have been developed in the tunnel construction industry to improve the constructability of tunnels and decrease the impact on surrounding structures. This paper presents a framework for… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
3
2
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 24 publications
0
5
0
Order By: Relevance
“…Nowadays, private partners are increasingly using more advanced and sophisticated methods of artificial intelligence: random forest (RF), neural networks (ANN), support vectors machine (SVM), fuzzy logic, genetic algorithms, etc. (Chou et al 2013;Abdallah, Marzouk 2013;Jingzhu, Ng 2013;Yazdani-Chamzini 2014). These methods can solve quite complex tasks and forecast the future results even with only partial project information.…”
Section: Theoretical Model For Effectiveness Evaluation Of Ppp Infrasmentioning
confidence: 99%
“…Nowadays, private partners are increasingly using more advanced and sophisticated methods of artificial intelligence: random forest (RF), neural networks (ANN), support vectors machine (SVM), fuzzy logic, genetic algorithms, etc. (Chou et al 2013;Abdallah, Marzouk 2013;Jingzhu, Ng 2013;Yazdani-Chamzini 2014). These methods can solve quite complex tasks and forecast the future results even with only partial project information.…”
Section: Theoretical Model For Effectiveness Evaluation Of Ppp Infrasmentioning
confidence: 99%
“…Developing simulation models requires not only knowledge of using software but also an understanding of construction processes. The general descriptions of the C&C and microtunneling methods are not covered in this paper, as they are well covered in the literature [25,[37][38][39][40][41][42]. To develop the simulation models of microtunneling and C&C methods, the required activities are determined.…”
Section: Symbol Descriptionmentioning
confidence: 99%
“…Simulation modeling has been used to study, analyze, and plan various types of tunneling projects, such as [20][21][22][23][24]. However, few tunneling studies have used simulation to model C&C [25] and microtunneling [26][27][28][29][30] construction methods. Although simulation has been used for tunneling projects, such as water and metro tunnels, a lack of research on using stochastic simulation for MUT construction to compare the duration and cost of different construction methods remains.…”
Section: Introductionmentioning
confidence: 99%
“…These projects have usually long durations and large budgets due to their complexity, risks and uncertainties. In general, the conventional methods of tunneling have fewer processes, which make it easier for planning with traditional construction techniques such as preceding diagram method (PDM), critical path method (CPM), program evaluation and review techniques (PERT) or line of balance method (LOB) (Abdalla & Marzouk, 2013).…”
Section: Introductionmentioning
confidence: 99%