2019 5th Conference on Knowledge Based Engineering and Innovation (KBEI) 2019
DOI: 10.1109/kbei.2019.8734960
|View full text |Cite
|
Sign up to set email alerts
|

Planning Poker in cost estimation in Agile methods: Averaging Vs. Consensus

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
16
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 20 publications
(17 citation statements)
references
References 22 publications
1
16
0
Order By: Relevance
“…To investigate the hypotheses and research question, regression analysis and correlation were used to estimate the unique relationship between each of the questionnaire and outcome variables in this study. Furthermore, to assess where there were significant differences amongst the thorough ttest [76][77][78].…”
Section: • Data Analysismentioning
confidence: 99%
“…To investigate the hypotheses and research question, regression analysis and correlation were used to estimate the unique relationship between each of the questionnaire and outcome variables in this study. Furthermore, to assess where there were significant differences amongst the thorough ttest [76][77][78].…”
Section: • Data Analysismentioning
confidence: 99%
“…All these literature studies on user stories (i.e., [50]- [52], [228]) were systematic literature reviews that reviewed a limited set of papers (24 to 38) for answering specific review research questions. Given that the user story is the most popular RE artifact in ASD [15], [16], [24] and interaction with users during ASD remains challenging [2], [14], [53], a systematic mapping of all published research on user stories will contribute to an overview and better understanding of our knowledge regarding this technique. As a systematic literature mapping of 186 unique peer-reviewed studies on user stories, this paper distinguishes itself from the systematic literature reviews with specific user story research foci that were discussed in this section.…”
Section: B Previous Literature Studiesmentioning
confidence: 99%
“…All these make agile less productive for efficient soft-ware development. Therefore, the agile methodology needs some improvements in its methods to become suitable for all types of projects and needs to introduce a cost estimation process with some new team-based estimation procedure to make accurate estimation [9,10,11].…”
Section: Problem Statementmentioning
confidence: 99%
“…Agile also facilitates the client to prioritize the user stories and can give change requests at any level of the project [3]. Agile methods are productive for small-scale projects, small-size teams, requirements welcomed, and group effort estimation for example a planning poker technique [9]. In the agile methodology, the project manager leads estimates the project effort with teamwork [40].…”
Section: Introductionmentioning
confidence: 99%