2019
DOI: 10.1155/2019/2045125
|View full text |Cite
|
Sign up to set email alerts
|

Predictive Analysis of Settlement Risk in Tunnel Construction: A Bow‐Tie‐Bayesian Network Approach

Abstract: A hybrid method consisting of bow-tie-Bayesian network (BT-BN) analysis and fuzzy theory is proposed in this research, in order to support predictive analysis of settlement risk during shield tunnel excavation. We verified the method by running a probabilistic safety assessment (PSA) for a tunnel section in the Wuhan metro system. Firstly, we defined the “normal excavation phase” based on the fuzzy statistical test theory. We eliminated the noise records in the tunnel construction log and extracted the occurre… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 13 publications
(14 citation statements)
references
References 39 publications
0
14
0
Order By: Relevance
“…Fourth, to determine the basic events in construction accidents, fault tree analysis could be performed [ 38 ]. Fifth, for the key basic event identified, the bow-tie model could be adopted to reduce the risk of construction accidents by implementing corresponding safety measures [ 51 ].…”
Section: Discussionmentioning
confidence: 99%
“…Fourth, to determine the basic events in construction accidents, fault tree analysis could be performed [ 38 ]. Fifth, for the key basic event identified, the bow-tie model could be adopted to reduce the risk of construction accidents by implementing corresponding safety measures [ 51 ].…”
Section: Discussionmentioning
confidence: 99%
“…Yazdani-Chamzini [ 12 ] designed a risk assessment-based fuzzy inference system to prioritize the risks of tunneling construction. Liu et al [ 13 ] computed the occurrence probabilities of tunnel construction risks using the hybrid bow-tie method-based Bayesian network. Chung et al [ 14 ] presented a shield TBM risk analysis model (STRAM) to analyze risks of geology, design, and construction management.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Meanwhile, he proposed a causal network matrix model suitable for tunnel construction safety risk analysis. In order to predict settlement risk during shield excavation reference [ 46 ], we proposed a fuzzy hybrid method for coupling Bayesian network and bow-tie model. By integrating weighted expert opinions, probabilities of environmental faults, operation errors, and other faults are obtained, and settlement risk values evaluated systematically from multiple aspects.…”
Section: Literature Reviewmentioning
confidence: 99%