2020
DOI: 10.1016/j.gloei.2020.03.008
|View full text |Cite
|
Sign up to set email alerts
|

Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2020
2020
2025
2025

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 5 publications
0
4
0
Order By: Relevance
“…Using these average daily energy budgets estimated by VIC-Res, GridPath-SAPP determines the hourly dispatch for each reservoir within a maximum limit (determined by the rated capacity) and a minimum limit (assumed to be 30% of the average daily energy budget), ensuring maximum generation for each day does not exceed the daily energy budget. The design specifications of existing and planned reservoirs were retrieved from global reservoir and dam databases 59,62 , and complemented by basin-specific studies on Zambezi 63 , Congo 64 , Cunene 65 , Kwanza 66 , Rufiji 67 , and Orange 68 . For more details on the hydropower power potential characterization methodology and validation, see 26 .…”
Section: Hydropower Characterization and Screeningmentioning
confidence: 99%
“…Using these average daily energy budgets estimated by VIC-Res, GridPath-SAPP determines the hourly dispatch for each reservoir within a maximum limit (determined by the rated capacity) and a minimum limit (assumed to be 30% of the average daily energy budget), ensuring maximum generation for each day does not exceed the daily energy budget. The design specifications of existing and planned reservoirs were retrieved from global reservoir and dam databases 59,62 , and complemented by basin-specific studies on Zambezi 63 , Congo 64 , Cunene 65 , Kwanza 66 , Rufiji 67 , and Orange 68 . For more details on the hydropower power potential characterization methodology and validation, see 26 .…”
Section: Hydropower Characterization and Screeningmentioning
confidence: 99%
“…To set up VIC-Res, we used the global flow direction map 57 with the same spatial resolution of VIC. The design specifications of existing and planned reservoirs are retrieved from global reservoir and dam databases, 58,59 and complemented by basin-specific studies on Zambezi, 60 Congo, 61 Cunene, 62 Kwanza, 63 Rufiji, 64 and Orange. 65 We simulated daily streamflow and daily hydropower budget for the 1997-2016 period (Figure S13).…”
Section: Hydropower Model and Simulationmentioning
confidence: 99%
“…The creation of mega centers of power generation on the basis of renewable energy sources, for example, large-scale hydropower plants -HPP ("Three Gorges" HPP on the Cháng Jiāng River in China, a large HPP on the Congo River in Central Africa and others) and mega parks of windmills in the North Sea and on the Arctic coast of Russia, solar power plants in the Sahara and Gobi Deserts, and others, is a relatively new factor [14,15]. Figure 2 gives an example of a mega project of West European Electric Power Interconnection development on the basis of wind turbines in the North Sea and solar power plants in the Sahara Desert [16].…”
Section: Structural Trends In the Eps Developmentmentioning
confidence: 99%