2020
DOI: 10.1061/(asce)co.1943-7862.0001923
|View full text |Cite
|
Sign up to set email alerts
|

Pretendering Decision Model for Contractor Selection of Public Procurement Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 12 publications
(4 citation statements)
references
References 11 publications
0
3
0
Order By: Relevance
“…Y. Wen-Der et al [26] report a pre-tendering contractor selection analysis model based on historical procurement data. Y.N.…”
Section: Discussion Of Previous Studies and Contributions Of This Stu...mentioning
confidence: 99%
“…Y. Wen-Der et al [26] report a pre-tendering contractor selection analysis model based on historical procurement data. Y.N.…”
Section: Discussion Of Previous Studies and Contributions Of This Stu...mentioning
confidence: 99%
“…Lew et al [25] developed a structural equation model that evaluates the data obtained from 162 general contractor companies. Yu et al [26] developed a model called PreCSAM for contractor selection. This model offers a three-stage evaluation with criteria such as the lowest offer and the best value.…”
Section: Literature Researchmentioning
confidence: 99%
“…The construction industry is characterized by complex environments, adversity, intense competition, heavy construction tasks, and the high number of fixed assets required. Given these factors, it has become increasingly challenging to select reputable construction contractors who are capable of providing quality, streamlining the construction process, and reducing project costs [1][2][3][4]. Generally, tending and bidding remain the most common methods for hiring qualified contractors.…”
Section: Introductionmentioning
confidence: 99%