2016
DOI: 10.3390/min6020051
|View full text |Cite
|
Sign up to set email alerts
|

Preventive Replacement Decisions for Dragline Components Using Reliability Analysis

Abstract: Reliability-based maintenance policies allow qualitative and quantitative evaluation of system downtimes via revealing main causes of breakdowns and discussing required preventive activities against failures. Application of preventive maintenance is especially important for mining machineries since production is highly affected from machinery breakdowns. Overburden stripping operations are one of the integral parts in surface coal mine productions. Draglines are extensively utilized in overburden stripping ope… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
9
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
10

Relationship

1
9

Authors

Journals

citations
Cited by 23 publications
(9 citation statements)
references
References 24 publications
0
9
0
Order By: Relevance
“…Technological features of open pit mining operations in the coal-bearing zone are: -the height of the bench here is equal to the height of the bench of the coal-less zone, where powerful rope shovels made in Russia and former Soviet Union (ECG-5A, ECG-8I, ECG 10, ECG-12, ECG-15, ECG-20 with bucket capacity 5-20 m 3 ) and "Harnischfeger" models are used, with the bench height of 10-16 m. The equality of the heights of the benches in both zones is due to technological requirements [4][5][6]; -in the calendar planning, trenches and coal-and rock stopes are cut with the height equal to the height of benches in the coal-less zone. When they are developed, an alternate excavation of rock and coal is carried out.…”
Section: Methodsmentioning
confidence: 99%
“…Technological features of open pit mining operations in the coal-bearing zone are: -the height of the bench here is equal to the height of the bench of the coal-less zone, where powerful rope shovels made in Russia and former Soviet Union (ECG-5A, ECG-8I, ECG 10, ECG-12, ECG-15, ECG-20 with bucket capacity 5-20 m 3 ) and "Harnischfeger" models are used, with the bench height of 10-16 m. The equality of the heights of the benches in both zones is due to technological requirements [4][5][6]; -in the calendar planning, trenches and coal-and rock stopes are cut with the height equal to the height of benches in the coal-less zone. When they are developed, an alternate excavation of rock and coal is carried out.…”
Section: Methodsmentioning
confidence: 99%
“…The following research methods are used in the work: analysis of mining operations on surface mines; analysis and synthesis of scientific research and technological development results; statistical method for processing the results of observations [1].…”
Section: Methodsmentioning
confidence: 99%
“…Mining is machine intensive and production is negatively affected by machine breakdowns (Demirel and Gölbaşı, 2016). Therefore, PM planning is significant for preventing production losses.…”
Section: Introductionmentioning
confidence: 99%