2015
DOI: 10.1007/s11750-015-0377-9
|View full text |Cite
|
Sign up to set email alerts
|

Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
20
0
1

Year Published

2016
2016
2021
2021

Publication Types

Select...
7
3

Relationship

1
9

Authors

Journals

citations
Cited by 68 publications
(21 citation statements)
references
References 33 publications
0
20
0
1
Order By: Relevance
“…One can use discrete investment instead of continuous investment for automonated (Sarkar et al [63]) inspection policy, which may be more beneficial for some industry. One another limitation of this proposed model is the fixed setup cost, but a variable setup cost is more beneficial for some production system (Tiwari et al [64]) and variable setup cost can be reduced by some continuous or discrete investment (Sakar and Chung [65]) .…”
Section: Discussionmentioning
confidence: 99%
“…One can use discrete investment instead of continuous investment for automonated (Sarkar et al [63]) inspection policy, which may be more beneficial for some industry. One another limitation of this proposed model is the fixed setup cost, but a variable setup cost is more beneficial for some production system (Tiwari et al [64]) and variable setup cost can be reduced by some continuous or discrete investment (Sakar and Chung [65]) .…”
Section: Discussionmentioning
confidence: 99%
“…Recently, Avci (2019) and Yoon et al (2020) examined the importance of lateral transshipments and having information sharing between members of echelons to mitigate the impact of disruptions. Also some related research can be found in Taleizadeh et al (2013 , 2016a , b) and Lashgary et al (2016) .…”
Section: Literature Reviewmentioning
confidence: 95%
“…[17] optimized a stochastic lotsizing difficulty for a single faulty stage generation system with paramount rework, faulty preventive preservation, and minimal repair. [46] studied replenishment and pricing strategies for a defective process with paramount rework and various deliveries. [47] solved the multi-delivery lot-sizing dilemma with a partial rework.…”
Section: Reworkmentioning
confidence: 99%