“…To the knowledge of the authors, there is no study in the literature that combines CBs maintenance prioritization, confirmation of need of maintenance for the CB with the highest priority, and identifying the faulty part of the considered CB and the type of failure, and this is the main contribution of this paper, that is, proposing a combined procedure of prioritizing CBs for maintenance, evaluating failure confirmation of the CB with the highest priority and determination of the faulty part in that CB. Here, similar to [1,3,5,7,8,10,12,14,15], and [20][21][22], coil current information is used to investigate CB conditions. The reason for using this data is that this data show the mechanical condition of CB, which is the major fault of CBs.…”