2008
DOI: 10.1016/j.cie.2007.07.002
|View full text |Cite
|
Sign up to set email alerts
|

Prioritizing equipments for preventive maintenance (PM) activities using fuzzy rules

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
39
0
2

Year Published

2011
2011
2021
2021

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 56 publications
(41 citation statements)
references
References 25 publications
0
39
0
2
Order By: Relevance
“…The process of the fuzzifier, inference and defuzzifier of our model is demonstrated in Fig. 1 that it has derived from a generic example presented by Zafiropoulos and Dialynas (2005) and Khanlari et al (2008) with two inputs and a single output (with this difference that in our paper the product is used for the implication method and center of maximum for the defuzzification). In the fuzzifier, the crisp inputs are fuzzified into linguistic values.…”
Section: Determining Ops Of the Items In Class B Using Fuzzy Rulesmentioning
confidence: 99%
See 1 more Smart Citation
“…The process of the fuzzifier, inference and defuzzifier of our model is demonstrated in Fig. 1 that it has derived from a generic example presented by Zafiropoulos and Dialynas (2005) and Khanlari et al (2008) with two inputs and a single output (with this difference that in our paper the product is used for the implication method and center of maximum for the defuzzification). In the fuzzifier, the crisp inputs are fuzzified into linguistic values.…”
Section: Determining Ops Of the Items In Class B Using Fuzzy Rulesmentioning
confidence: 99%
“…But inventory managers are still confused in adopting policies on this class, since either no discussion has been held over determining the certain OPs of class B, or this issue has been discussed with ambiguity. In this paper, the certain suitable ordering systems for the items of classes A and C are first presented, and then fuzzy rules are extracted for such policies using the Zafiropoulos and Dialynas approach (2005) and Khanlari, Mohammadi, and Sohrabi (2008). Next, by means of these rules, the suitable policies are presented for the items of class B as well.…”
Section: Introductionmentioning
confidence: 99%
“…A manutenção preventiva objetiva evitar problemas inesperados durante o uso, minimizando o custo total de inspeção e reparo (Khanlari et al, 2008). Caso não seja realizada, é necessário proceder à manutenção corretiva, a qual visa corrigir falhas e é uma estratégia usada para reparar ou substituir partes (Blanchard et al, 1995).…”
Section: Manutenção Preventiva Em Máquinas E Equipamentosunclassified
“…Corrective maintenances fireman maintenance is performed when the action is taken to restore the previous functionality. This type of maintenance is known as a reactive approach because the action is started when the unscheduled event happens (Khanlari et al 2007). Preventive maintenance includes repair, replacement, and maintenance of equipment to avoid unexpected failure during use (Mann et al 1995).…”
Section: Preventive Maintenancementioning
confidence: 99%