Prioritizing risks in sustainable construction projects using a risk matrix-based Monte Carlo Simulation approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
38
0
2

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 72 publications
(67 citation statements)
references
References 73 publications
0
38
0
2
Order By: Relevance
“…This result highlights the relative importance of the detection rating factor and the application of FMEA instead of risk matrices (Haji Shahverdi and Zomorodian 2020), since the detection rating factor summarizes a lot of information, which can be taken into account during the assessment. Additionally, the application of the FMEA instead of risk matrixes can be advised in other operation fields (Qazi et al 2021).…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…This result highlights the relative importance of the detection rating factor and the application of FMEA instead of risk matrices (Haji Shahverdi and Zomorodian 2020), since the detection rating factor summarizes a lot of information, which can be taken into account during the assessment. Additionally, the application of the FMEA instead of risk matrixes can be advised in other operation fields (Qazi et al 2021).…”
Section: Discussionmentioning
confidence: 99%
“…The complexity of the risk assessment can usually be managed using three different methods: quantitative, qualitative and applying both. Typical approaches in quantitative assessment methods and processes are failure mode and effect analysis (FMEA) and its variants (Liu et al 2013), risk matrixes (RM) (Losiewicz-Dniestrzanska 2015) and their variants (Qazi et al 2021), as well as the combination of these methodologies, such as the partial risk map (PRISM) methodology (Bognár and Benedek 2021). The FMEA methodology can be used to assess the risk of potential or existing failures of specific processes and prevent their occurrence.…”
Section: Contextual Backgroundmentioning
confidence: 99%
“…Monte Carlo [32], ontology [33], Bayesian network, and other methods have been applied in construction risk identification. BIM technology [34], queuing method [35], particle swarm optimization [36], combined dynamic weighting method [37], work decomposition structure (WBS)-risk decomposition structure (RBS) risk identification matrix [38], and other methods have been applied in construction risk evaluation.…”
Section: Status Of Construction Riskmentioning
confidence: 99%
“…Banyak penelitan yang telah berhasil menerapkan metode Monte Carlo dalam melakukan prediksi diantaranya dengan simulasi Monte Carlo menguji pengaruh pandemic COVID19 terhadap volatilitas pengembalian minyak, yang berhasil menyimpulkan bahwa selama krisis virus corona terdapat fakta bahwa terjadi penurunan volatilitas harga minyak yang merupakan akibat dari krisis covid-19 [11]. Di Uni Emirat Arab Simulasi Monte Carlo, juga digunakan untuk mengoperasionalkan proses baru dalam memprioritaskan risiko proyek sehingga dapat dilakukan penanganan dini terhadap resiko yang berdampak besar yang dilakukan dengan menggunakan data matriks risiko [12].…”
Section: Pendahuluanunclassified