2017
DOI: 10.1007/s00170-017-0057-z
|View full text |Cite
|
Sign up to set email alerts
|

Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 37 publications
(15 citation statements)
references
References 21 publications
0
15
0
Order By: Relevance
“…Conversely, the optimization in terms of cost for proper resources utilization, BCR, asks for more work orders of engine overhaul. In general, scheduling a service-oriented manufacturing system must pursue customer satisfaction [ 47 ]. Due to the high value of the availability of aircraft engines, the costs of the operation of an MRO cannot disregard the contractual charges due to delays or overdue work orders.…”
Section: Analysis and Discussionmentioning
confidence: 99%
“…Conversely, the optimization in terms of cost for proper resources utilization, BCR, asks for more work orders of engine overhaul. In general, scheduling a service-oriented manufacturing system must pursue customer satisfaction [ 47 ]. Due to the high value of the availability of aircraft engines, the costs of the operation of an MRO cannot disregard the contractual charges due to delays or overdue work orders.…”
Section: Analysis and Discussionmentioning
confidence: 99%
“…In consequence, the NPFS approach becomes constructive for two/three machines [58]. This analysis is being refined by newer results (Tab.…”
Section: Problemmentioning
confidence: 98%
“…Ant Lion describes the position matrix for the Ant Lion according to (14) while the fitness function is represented by the matrix OAL based (15).…”
Section: Initialization Of the Search Agent Positionsmentioning
confidence: 99%
“…Moreover, a greedy A R T I C L E I N F O algorithm was used by Karabulut [6], while Fernandez-Viagas and Framinan [12] developed a nonpopulation-based algorithm. M'Hallah [13] also proposed a hybrid heuristic model, while Kim et al [14] suggested a new priority on flow shop scheduling. Despite the fact there are several kinds of literature on heuristics algorithm, NEH has been reported to perform effectively for PFSP cases [15].…”
Section: Introductionmentioning
confidence: 99%