2023
DOI: 10.1016/j.tust.2023.105342
|View full text |Cite
|
Sign up to set email alerts
|

Probabilistic analysis of crown settlement in high-speed railway tunnel constructed by sequential excavation method considering soil spatial variability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 37 publications
0
1
0
Order By: Relevance
“…(2016) analyzed the monitoring data of the subway foundation pit and constructed an evaluation model combining the analytic hierarchy process (AHP) and fuzzy comprehensive evaluation to determine the risk evaluation level of the foundation pit construction. Zhang et al. (2021) used the GM (1,1) algorithm to analyze the existing high-speed railway subgrade settlement data.…”
Section: Literature Reviewmentioning
confidence: 99%
“…(2016) analyzed the monitoring data of the subway foundation pit and constructed an evaluation model combining the analytic hierarchy process (AHP) and fuzzy comprehensive evaluation to determine the risk evaluation level of the foundation pit construction. Zhang et al. (2021) used the GM (1,1) algorithm to analyze the existing high-speed railway subgrade settlement data.…”
Section: Literature Reviewmentioning
confidence: 99%