“…Secondly, during the installation process, it is necessary to strengthen the analysis of the design scheme, ensure that the installation position is consistent with the design scheme, and implement scientific dust removal measures to prevent excessive dust from affecting the installation effect. Finally, during the installation process of the ventilation system, due to the presence of a large number of concealed engineering projects and the irreversible nature of the installation process, it is necessary to strengthen the analysis of maintenance and repair during installation, reserve more space, and lay a solid foundation for subsequent construction and maintenance (Ishchenko, 2020;Senchenko et al, 2020). The ventilation system plays a crucial role, and to meet installation requirements, it is necessary to strengthen the optimization selection of processes, materials, and personnel.…”