2009
DOI: 10.1007/978-3-642-04247-8_2
|View full text |Cite
|
Sign up to set email alerts
|

Production and Operations Management: Models and Algorithms

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 98 publications
0
2
0
Order By: Relevance
“…Hsu et al (2005) explored multiproduct lot size problems with and without conversion cost, and developed a heuristic method to solve them. Lang (2009) provided a detailed review of this topic. The aim of these works was to propose algorithms to get the solution.…”
Section: Substitution In Demand Managementmentioning
confidence: 99%
“…Hsu et al (2005) explored multiproduct lot size problems with and without conversion cost, and developed a heuristic method to solve them. Lang (2009) provided a detailed review of this topic. The aim of these works was to propose algorithms to get the solution.…”
Section: Substitution In Demand Managementmentioning
confidence: 99%
“…Additionally, supplier selection and capacity planning are frequently taken into consideration in DLS models and a large amount of literature is dedicated to the production planning problem by using DLS models. "This is due to the ubiquity of lot-sizing and scheduling decision problems in manufacturing firms and the large variety of production types in these firms, which often require specialized models" (Lang (2010)).…”
Section: Dynamic Lot Sizing Modelsmentioning
confidence: 99%