2018
DOI: 10.1504/ijor.2018.092738
|View full text |Cite
|
Sign up to set email alerts
|

Production inventory model with reworking of imperfect items and integrates cost reduction delivery policy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…This is quite different from a previous study which was conducted by (Sanjai & Periyasamy, 2018). They integrated cost reduction delivery policy into production inventory model.…”
Section: Discussionmentioning
confidence: 60%
“…This is quite different from a previous study which was conducted by (Sanjai & Periyasamy, 2018). They integrated cost reduction delivery policy into production inventory model.…”
Section: Discussionmentioning
confidence: 60%
“…A detailed comparison is presented in Table 9. Due to the use of a flexible production system, an assembled product, and single-stage manufacturing and remanufacturing, the present study reduces costs more than twenty times compared to the models of Sivashankari and Panayappan [9] and Sanjai and Periyasamy [10]. On the other hand, the cost of this study is more than seven times higher than that of C árdenas-Barr ón's [4] and Sarkar et al's [5] models.…”
Section: Distribution Formula For Calculating the Expected Value E[β J ]mentioning
confidence: 73%
“…However, the concept of an assembled item, where each part of the item is manufactured and remanufactured in the same generation cycle with a flexible production rate and different distributed defect rates, was neglected by Sivashankari and Panayappan [9], which increased the system cost tremendously. Similarly, Sanjai and Periyasamy [10] proposed a production-inventory system with imperfect generation under different delivery policies. They neglected the concepts of variable production rates and assembled products.…”
Section: Production-inventory System Under Flexible Productionmentioning
confidence: 99%