2013
DOI: 10.1016/j.ijpe.2012.09.008
|View full text |Cite
|
Sign up to set email alerts
|

Production lot sizing with a secondary outsourcing facility

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2022
2022

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 21 publications
0
1
0
Order By: Relevance
“…Coman and Ronen [28] introduced a linear programming problem in which they considered outsourcing. An extended EPQ model with outsourcing with a secondary utilization, manufacturing planning, inventory control, and stochastic demand was considered by Lee and Lan [29]. Hahn et al [30] developed a situation-based nonparametric positioning approach to identify valuable outsourcing choices at the essential level.…”
Section: Outsourcingmentioning
confidence: 99%
“…Coman and Ronen [28] introduced a linear programming problem in which they considered outsourcing. An extended EPQ model with outsourcing with a secondary utilization, manufacturing planning, inventory control, and stochastic demand was considered by Lee and Lan [29]. Hahn et al [30] developed a situation-based nonparametric positioning approach to identify valuable outsourcing choices at the essential level.…”
Section: Outsourcingmentioning
confidence: 99%