2018
DOI: 10.3390/pr6110228
|View full text |Cite
|
Sign up to set email alerts
|

Production Process Optimization of Metal Mines Considering Economic Benefit and Resource Efficiency Using an NSGA-II Model

Abstract: The optimization of the production process of metal mines has been traditionally driven only by economic benefits while ignoring resource efficiency. However, it has become increasingly aware of the importance of resource efficiency since mineral resource reserves continue to decrease while the demand continues to grow. To better utilize the mineral resources for sustainable development, this paper proposes a multi-objective optimization model of the production process of metal mines considering both economic … Show more

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 19 publications
(8 citation statements)
references
References 44 publications
0
8
0
Order By: Relevance
“…Productivity growth is a major driver of technology development, and the decline in social and environmental impacts is a positive side effect. According to I. Ramdoo: «The digitization of mining enterprises will further improve economic and environmental performance» [21].…”
Section: Methodsmentioning
confidence: 99%
“…Productivity growth is a major driver of technology development, and the decline in social and environmental impacts is a positive side effect. According to I. Ramdoo: «The digitization of mining enterprises will further improve economic and environmental performance» [21].…”
Section: Methodsmentioning
confidence: 99%
“…Equation (16) shows that at time t, the time for the workpiece Wp i to be transferred from the workstation of the stage Stage j to the public buffer is equal to the difference between the time for the workpiece Wp i to leave the workstation of stage Stage j at time t.…”
Section: Constraints Of the Public Buffermentioning
confidence: 99%
“…It creates the transfer scheduling problem of the workpiece between limited buffer and public buffer, which further increases the uncertainty of the scheduling result and the difficulty of resolving the scheduling problem [15]. Consequently, it is necessary to explore an effective scheduling method for the flexible flow shop scheduling problem with public buffer (FFSP-PB) due to its role in reducing the production blockage and improving the utilization of production resources [16,17]. Therefore, it is of great theoretical and engineering value to solve this problem.…”
Section: Introductionmentioning
confidence: 99%
“…O'Sullivan and Newman [22] proposed an optimization heuristic algorithm to set a complex set of constraints based on an optimization algorithm in a mining operation model for an underground lead-zinc mine in Ireland. Wang et al [23] proposed a multi-objective optimization model formulation by taking the grade of mined and processed ore as the main constraint, maximizing mining returns and efficient use of natural resources as the objective function, and used a genetic algorithm to find the optimal solution to the multi-objective optimization problem. Nesbitt et al [24] considered the uncertainty faced in the economic value of minerals faced by mines with long operating cycles.…”
Section: Introductionmentioning
confidence: 99%