2009
DOI: 10.1016/j.rser.2008.03.006
|View full text |Cite
|
Sign up to set email alerts
|

Progress and methodologies of lifecycle commissioning of HVAC systems to enhance building sustainability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
30
0

Year Published

2010
2010
2019
2019

Publication Types

Select...
4
2
2

Relationship

0
8

Authors

Journals

citations
Cited by 73 publications
(30 citation statements)
references
References 17 publications
0
30
0
Order By: Relevance
“…If current trends continue this movement towards more complex systems will result in a more expensive and lengthy commissioning processes. Xiao and Wang (2009) supported this hypothesis stating that commissioning is labor intensive and that the future will be that of an automated lifecycle commissioning process embedded in the operation of the BEMS (Xiao and Wang 2009). Xiao and Wang (2009) also stated that AFDD is a key means of achieving automated commissioning (Xiao and Wang 2009).…”
Section: How Can Afdd Tools Improve Ahu Maintenance and Hence Performmentioning
confidence: 94%
See 1 more Smart Citation
“…If current trends continue this movement towards more complex systems will result in a more expensive and lengthy commissioning processes. Xiao and Wang (2009) supported this hypothesis stating that commissioning is labor intensive and that the future will be that of an automated lifecycle commissioning process embedded in the operation of the BEMS (Xiao and Wang 2009). Xiao and Wang (2009) also stated that AFDD is a key means of achieving automated commissioning (Xiao and Wang 2009).…”
Section: How Can Afdd Tools Improve Ahu Maintenance and Hence Performmentioning
confidence: 94%
“…Approximately 50 % of a commercial building's energy consumption is associated with HVAC energy consumption (Xiao and Wang 2009). Overall, it is estimated that HVAC energy consumption accounts for 10-20 % of total energy consumption in developed countries (Pérez-Lombard et al 2008) with AHU associated energy use accounting for the majority of this.…”
Section: Introductionmentioning
confidence: 99%
“…This includes Claridge et al (2004, p. 19), Liu (1999, pp. 46 -56), and Xiao andWang (2009, p. 1145), who find the highest quality of Cx occurs regularly over the lifetime of a building, and NEBB's definition of the highest quality of Cx as whole building technical commissioning (WCx): Figure 1 The quality model of commissioning…”
Section: Model Of Commissioningmentioning
confidence: 99%
“…Cx has been a feature of the commercial building industry since the introduction of building services at the beginning of the 20th century (Xiao & Wang, 2009, p. 1145. Commissioning was previously focused on setting to work of heating, ventilation and air-conditioning (HVAC), before becoming a quality process addressing all systems and assemblies (Sterling & Collett, 1994 …”
Section: Introductionmentioning
confidence: 99%
“…The direct energy needs are for construction, operation and demolition. Instead, the indirect energy needs are for the materials production and disposal [6,7]. The assessment method proposed in this paper does not consider all interactions between the building and the other natural resources such as soil, water, air, etc.. Also, it does not take into account the transitional stage of building construction and demolition, and the related impacts.…”
Section: Energy Efficiencymentioning
confidence: 99%