Quantifying Risk in Traditional Energy and Sustainable Investments

Abstract: These days we are witnessing a deep change in the characteristics of the type of energy that our economies are supplied with. A clear trend is that sustainable and green energies are decisively replacing traditional fossil fuel-based sources of energy. For various reasons, this fundamental change implies an increasing risk in investments on portfolios heavily based on traditional energy industries. What is less known, is that these industries have returns that show a very low correlation with sustainable fossi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 59 publications
0
1
0
Order By: Relevance
“…The problem of risks of the realization of large scale investment projects as a tool of the infrastructural development of territories (such as, for instance, La Manche tunnel, Øresund Bridge between Denmark and Sweden, Vasco da Gama bridge in Portugal and others) was thoroughly studied in the works of the scientists: (Achten et al, 2019;Bayrak, 2018;Bogoviz & Sergi, 2018;Brazill-Boast et al, 2018;Fragkos& Kouvaritakis, 2018;Genoud, 2018;Moreda, 2018;Morozova et al, 2018;Osabuohien et al, 2019;Popkova, 2019); Sergi et al, 2019;Zheng et al, 2019). The problems of risks identification, practical aspects of their realization in historic and current territorial megaprojects and methodological aspects of the assessment and leveling of the risks at different stages of the life cycle of a large scale investment project were studied in the works of the scientists: (Bi & Cai, 2019); Bo et al, 2019;Clark, 2019;Díaz et al, 2019;D'Orazio & Popoyan, 2019;Huang, 2019;Huber & Huber, 2019;Wan et al, 2019;Zhang & Chen, 2019).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The problem of risks of the realization of large scale investment projects as a tool of the infrastructural development of territories (such as, for instance, La Manche tunnel, Øresund Bridge between Denmark and Sweden, Vasco da Gama bridge in Portugal and others) was thoroughly studied in the works of the scientists: (Achten et al, 2019;Bayrak, 2018;Bogoviz & Sergi, 2018;Brazill-Boast et al, 2018;Fragkos& Kouvaritakis, 2018;Genoud, 2018;Moreda, 2018;Morozova et al, 2018;Osabuohien et al, 2019;Popkova, 2019); Sergi et al, 2019;Zheng et al, 2019). The problems of risks identification, practical aspects of their realization in historic and current territorial megaprojects and methodological aspects of the assessment and leveling of the risks at different stages of the life cycle of a large scale investment project were studied in the works of the scientists: (Bi & Cai, 2019); Bo et al, 2019;Clark, 2019;Díaz et al, 2019;D'Orazio & Popoyan, 2019;Huang, 2019;Huber & Huber, 2019;Wan et al, 2019;Zhang & Chen, 2019).…”
Section: Literature Reviewmentioning
confidence: 99%