2015
DOI: 10.3997/2214-4609.201413638
|View full text |Cite
|
Sign up to set email alerts
|

Quantifying Uncertainty in Pore Pressure Estimation Using Bayesian Networks, with Application to Use of an Offset Well

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Blowouts, kicks, borehole washouts, wellbore breakout and stuck pipe (Oughton et al, 2015) are just some issues that may occur while encountering unexpected fluid pressure anomalies during drilling. To reduce the associated risks of drilling a robust mud plan and casing design is required as a part of every drilling operation (Nguyen et al, 2015;Wild et al, 2015).…”
Section: Introductionmentioning
confidence: 99%
“…Blowouts, kicks, borehole washouts, wellbore breakout and stuck pipe (Oughton et al, 2015) are just some issues that may occur while encountering unexpected fluid pressure anomalies during drilling. To reduce the associated risks of drilling a robust mud plan and casing design is required as a part of every drilling operation (Nguyen et al, 2015;Wild et al, 2015).…”
Section: Introductionmentioning
confidence: 99%