2006
DOI: 10.1016/j.tust.2005.12.171
|View full text |Cite
|
Sign up to set email alerts
|

RBJ for sizable underpass construction in saturated soft soils

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Through the site instrumentation, experiment and theoretical analysis, it is found that pipe roof can reduce soil disturbance and ground settlement [8][9][10] . With the advantage of the settlement control of the pipe roof, the roof-box jacking (RBJ) method was formed by combining the pipe roof method and the box culvert jacking method 11,12 . Under the effect of the pipe curtain, the excavation face stability during the box culvert jacking process is improved, which significantly reduces the degree of environmental impact 13,14 .…”
Section: Introductionmentioning
confidence: 99%
“…Through the site instrumentation, experiment and theoretical analysis, it is found that pipe roof can reduce soil disturbance and ground settlement [8][9][10] . With the advantage of the settlement control of the pipe roof, the roof-box jacking (RBJ) method was formed by combining the pipe roof method and the box culvert jacking method 11,12 . Under the effect of the pipe curtain, the excavation face stability during the box culvert jacking process is improved, which significantly reduces the degree of environmental impact 13,14 .…”
Section: Introductionmentioning
confidence: 99%