TENCON 2018 - 2018 IEEE Region 10 Conference 2018
DOI: 10.1109/tencon.2018.8650438
|View full text |Cite
|
Sign up to set email alerts
|

Reactive Hybrid Particle Swarm Optimization Based Job-shop Scheduling Problems Considering Energy Management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
3

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(8 citation statements)
references
References 17 publications
0
8
0
Order By: Relevance
“…For 10job 10-machine benchmark problem, the optimal makespan of 943 was obtained with HPSO 19 only at TL length of 40, while RHSPO offered the optimal makespan at any initial TL length according to the literature. 21 In this paper, too, the optimal makespan was obtained at any initial TL length for all proposed methods of improved parallel RHPSO. Figure 8 illustrates how average calculation time depends on the number of processes in improved parallel RHPSO (proposed method 3).…”
Section: (Parameters Of Improved Parallel Rhpso)mentioning
confidence: 99%
See 4 more Smart Citations
“…For 10job 10-machine benchmark problem, the optimal makespan of 943 was obtained with HPSO 19 only at TL length of 40, while RHSPO offered the optimal makespan at any initial TL length according to the literature. 21 In this paper, too, the optimal makespan was obtained at any initial TL length for all proposed methods of improved parallel RHPSO. Figure 8 illustrates how average calculation time depends on the number of processes in improved parallel RHPSO (proposed method 3).…”
Section: (Parameters Of Improved Parallel Rhpso)mentioning
confidence: 99%
“…19 The authors used reactive HPSO (RHPSO) in which TS module of HPSO is replaced with RTS (conventional method 2), and confirmed better quality of solutions as compared to the conventional method 1. 21 However, with the conventional method 2, only order of adjacent job pairs was changed in a CB, which posed a problem in neighborhood schedule generation. Thus, there still was room for F I G U R E 2 Integrated framework of primary problem and subproblem improvement of solution quality to secure diversity in neighborhood schedule generation using CB s.…”
Section: Recent Trends and Issued In Research On Job-shop Problemmentioning
confidence: 99%
See 3 more Smart Citations