2021
DOI: 10.1109/tase.2020.3021346
|View full text |Cite
|
Sign up to set email alerts
|

Real-Time Bottleneck in Serial Production Lines With Bernoulli Machines: Theory and Case Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 15 publications
(1 citation statement)
references
References 36 publications
0
1
0
Order By: Relevance
“…Currently, the identification and solution of bottlenecks in production are still lacking in practice, and the definition of bottlenecks varies in different fields of production environment, and bottlenecks may exist dynamically and are not unique [2]. According to the search, computer simulation and mathematical model analysis give numerous theoretical guidelines on the identification of bottlenecks [3]. In general, the absolute difference ratio between workstation capacity and workshop scheduling target determines the definition of bottlenecks, and thus [4].…”
Section: Introductionmentioning
confidence: 99%
“…Currently, the identification and solution of bottlenecks in production are still lacking in practice, and the definition of bottlenecks varies in different fields of production environment, and bottlenecks may exist dynamically and are not unique [2]. According to the search, computer simulation and mathematical model analysis give numerous theoretical guidelines on the identification of bottlenecks [3]. In general, the absolute difference ratio between workstation capacity and workshop scheduling target determines the definition of bottlenecks, and thus [4].…”
Section: Introductionmentioning
confidence: 99%