All Days 2012
DOI: 10.2118/150069-ms
|View full text |Cite
|
Sign up to set email alerts
|

Real-Time Drilling Engineering: Hydraulics and T&D Modeling for Predictive Interpretation While Drilling

Abstract: In the early stages of real-time data transmission from the rigsite, real-time monitoring engineers focused on viewing data as it was presented on the rigsite. While this setup was ideal for service quality and event mitigation, it fell short of providing predictions of wellbore condition. As remote real-time monitoring matures in its use of "while drilling" data, remote engineers need to identify issues before they affect drilling operations and are evident to rigsite personnel. Using a combina… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2012
2012
2022
2022

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 2 publications
0
2
0
1
Order By: Relevance
“…El emprendimiento es un factor polivalente y complejo que tiene factores que lo conforman: el desarrollo de las competencias del educando, la tecnología que aglutina los procesos de innovación y creatividad, los recursos materiales y financieros, y los conocimientos de la disciplina que se generan mediante la combinación de saberes. (Borjas, 2012;Vega-Guerrero y Mera-Rodríguez, 2016).…”
Section: Discussionunclassified
“…El emprendimiento es un factor polivalente y complejo que tiene factores que lo conforman: el desarrollo de las competencias del educando, la tecnología que aglutina los procesos de innovación y creatividad, los recursos materiales y financieros, y los conocimientos de la disciplina que se generan mediante la combinación de saberes. (Borjas, 2012;Vega-Guerrero y Mera-Rodríguez, 2016).…”
Section: Discussionunclassified
“…Real-time hydraulics and torque and tools such as drag (T&D) analysis and by using engineering models, Engineers work on the position of a well can be determined before half. [19] The Design Science and Engineering of RCS It started with the development of requirements system. The American I scoring Scientific Society developed scientific requirements that include core quality, desired core length, number of deflections per core at a specified depth.…”
Section: Drilling Engineeringmentioning
confidence: 99%
“…MULTIMOORA with triangular fuzzy numbers. [19] An FMEA-Based Pythagorean Fuzzy AHP-In the MOORA integrative approach literature Assess various occupational hazards from proposed. A key difference is in approach to ensure accurate risk assessment.…”
Section: Mooramentioning
confidence: 99%