Real Time Impact Control on Charging Energy Storage For Shipboard Power Systems
Yusheng Luo,
Sanjeev Srivastava,
Manish Mohanpurkar
et al.
Abstract:Medium voltage direct-current based integrated power system is projected as one of the solutions for powering the all-electric ship. It faces significant challenges for accurately energizing advanced loads, especially the pulsed power load, which can be rail gun, high power radar, and other state of art equipment. Energy storage based on supercapacitors is proposed as a technique for buffering the direct impact of pulsed power load on the power systems. However, the high magnitude of charging current of the en… Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.