2014
DOI: 10.2749/101686614x13830790993087
|View full text |Cite
|
Sign up to set email alerts
|

Rędziński Bridge in Wrocław—The Largest Concrete Cable-Stayed Bridge in Poland

Abstract: result of social protests against other alternative solutions. A large span bridge thus became necessary to allow for the unconstrained future modernization of Rę dzin water stage of fall and two water locks.The bridge consists of three substructures ( Fig. 2): -E1 southern fl yover: 610-m long, 11 span continuous beam (box girders) made of prestressed concrete, span lengths 40 + 2 × 52 + 56 + 6 × 60 + 50 m; -M2 cable-stayed main bridge: 612-m long, span lengths 50 + 2 × 256 + 50 m, with two separate superstru… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
8
0
1

Year Published

2015
2015
2024
2024

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 19 publications
(11 citation statements)
references
References 5 publications
0
8
0
1
Order By: Relevance
“…The main cable-stayed part of the Rędziński Bridge [6,15] consists of two parallel decks (Fig. 1) -east (E) and west (W) -connected with the central pylon by means of cable stays (Fig.…”
Section: Structure Characteristics and Measuring Systemmentioning
confidence: 99%
See 2 more Smart Citations
“…The main cable-stayed part of the Rędziński Bridge [6,15] consists of two parallel decks (Fig. 1) -east (E) and west (W) -connected with the central pylon by means of cable stays (Fig.…”
Section: Structure Characteristics and Measuring Systemmentioning
confidence: 99%
“…Access to the main bridge from the south is provided by two identical flyovers -one in each direction [5,6]. Each structure consists of 11 spans with the following lengths: 40 m + 2 Â 52 m + 56 m + 6 Â 60 m + 49 m, made of prestressed a r c h i v e s o f c i v i l a n d m e c h a n i c a l e n g i n e e r i n g x x x ( 2 0 1 5 ) x x x -x x x concrete C50/60.…”
Section: Structure Characteristics and Measuring Systemmentioning
confidence: 99%
See 1 more Smart Citation
“…A comparison of the bridge in Kwidzyn with the largest Polish concrete cable-stayed bridge-the Rędziński Bridge in Wrocław (Biliszczuk et al, 2014) in terms of basic material consumption (concrete and prestressing steel) and unit costs is presented in Biliszczuk et al (2016). Obtained results indicate that a concrete extradosed structure with a span of about 200 m can be economical in comparison with a large-span concrete cable-stayed bridge.…”
Section: Middle-and Long-span Bridgesmentioning
confidence: 99%
“…Mickiewicza 30, 30-059 Krakow, Poland, e-mail: cieplok@agh.edu.pl 2 PhD., Eng., Warsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw, Poland, e-mail: w.karwowski@il.pw.edu.pl 3 PhD., Eng., AGH University of Science and Technology, ul. Mickiewicza 30, 30-059 Krakow, Poland, e-mail: bednarski@agh.edu.pl measuring and monitoring of engineering structures like: bridges [15] [16], dams, tunnels [10], stadiums [10] etc.…”
Section: Introductionmentioning
confidence: 99%