Reliability, Risk Management, and Contingency of Construction Processes and Projects / Statybos Procesų Ir Projektų Patikimumas, Rizikos Ir Atsitiktinumų Valdymas

Abstract: The paper presents the evolution of concepts, an overview of research and applications pertaining to reliability in construction production, the use of reserves, robust itineraries, and contingency of time and cost. It describes areas of management advisory systems in relation to the cycle of risk analysis. The article also presents the main trends in different approaches to risk management in construction and construction project processes, such as reliability of production, discount methods, methods … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0
2

Year Published

2012
2012
2018
2018

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 39 publications
(11 citation statements)
references
References 41 publications
0
9
0
2
Order By: Relevance
“…All above introduced along with a number of other examples indicate that lack of evaluating relationships and feedback among risks on project objectives is one of the reasons behind the weak accuracy of risk assessment and risk analysis of construction projects and PPP projects (Nasirzadeh et al 2008;Tang et al 2011;Peckiene et al 2013;Turskis et al 2012). To support this, Zegordi et al (2012) developed a FANP-TOPSIS method for the risk assessment of EPC power plant project risks in Iran focusing on dependency and feedback among different criteria for risk assessment such as probability and impact.…”
Section: Literature Reviewmentioning
confidence: 97%
“…All above introduced along with a number of other examples indicate that lack of evaluating relationships and feedback among risks on project objectives is one of the reasons behind the weak accuracy of risk assessment and risk analysis of construction projects and PPP projects (Nasirzadeh et al 2008;Tang et al 2011;Peckiene et al 2013;Turskis et al 2012). To support this, Zegordi et al (2012) developed a FANP-TOPSIS method for the risk assessment of EPC power plant project risks in Iran focusing on dependency and feedback among different criteria for risk assessment such as probability and impact.…”
Section: Literature Reviewmentioning
confidence: 97%
“…One example is the approach of Lean Six Sigma. In the hybrid approach, different problems could be taken into considerationÁ multicriteria analysis , risk management (Kashiwagi et al 2009;Turskis et al 2012), and, technological development ( In the integrated approach to Lean Six Sigma (Han et al 2008) the typical activities resulting from the Lean Management concept, like:…”
Section: Hybrid Flexible Approach In Six Sigma Implementation In Consmentioning
confidence: 99%
“…This synthesis uses earlier individual own research (Kapliński, 2008(Kapliński, , 2009(Kapliński, , 2015Kapliński & Peldschus, 2011) and team research: Gajzler (2016), Dziadosz, Tomczyk, and Kapliński (2015), Dziadosz and Kończak (2016), Kalibatas, Kalibatienė, and Kapliński (2018), Turskis, Gajzler, and Dziadosz (2012), Zavadskas, Turskis, and Tamošaitiene (2008), Zima and Leśniak (2013).…”
Section: An Attempt Of a Synthesisunclassified