Research on Modeling and the Operation Strategy of a Hydrogen-Battery Hybrid Energy Storage System for Flexible Wind Farm Grid-Connection

Abstract: Energy storage systems used for the flexible grid connection of wind farms in terms of minute timescale usually consist of batteries. Due to the capacity constraints of batteries, when wind energy fluctuations exceed limits continuously, this type of energy storage system topology cannot present good performance. To solve this problem, this paper introduces a hybrid energy storage system (HESS) topology consisting of batteries and a hydrogen conversion system (HCS). To achieve a flexible wind farm grid connect… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
22
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 49 publications
(22 citation statements)
references
References 22 publications
0
22
0
Order By: Relevance
“…Another option for the BESS connection is a battery bank with a DC/AC PCS to be connected with the AC bus. A transformer can be installed at BESS output before local AC bus 39,40,41 or after local AC bus 42 to finally being connected with the grid. A few possible PV‐wind‐BESS structures are shown in Figure 5.…”
Section: Bess Technology and Batteriesmentioning
confidence: 99%
“…Another option for the BESS connection is a battery bank with a DC/AC PCS to be connected with the AC bus. A transformer can be installed at BESS output before local AC bus 39,40,41 or after local AC bus 42 to finally being connected with the grid. A few possible PV‐wind‐BESS structures are shown in Figure 5.…”
Section: Bess Technology and Batteriesmentioning
confidence: 99%
“…Some researchers tentatively VOLUME 4, 2016 consider the off-design characteristics for part of the HSS, paying attention to a certain device or a certain energy type instead of the whole system. In [14] and [15], approximately linear correlation between output power and the electrolyte temperature for the electrolytic cell is proposed for hydrogenbattery integrated scheduling and seasonal hydrogen storage scheduling, respectively. Despite the advantages of simple form and fast solution, there exist two disadvantages for the simple linear model.…”
Section: Introductionmentioning
confidence: 99%
“…Many research articles have been published about WECS that use hybrid energy storage systems (HESS) consisting of a battery and a supercapacitor [10][11][12]. Verboomen, J, et al [10] have proposed a model for fast power fluctuation caused by demand side load, which puts stress on batteries.…”
Section: Introductionmentioning
confidence: 99%