2011
DOI: 10.1016/j.proeng.2011.08.945
|View full text |Cite
|
Sign up to set email alerts
|

Research on Risk Evaluation in Urban Rail Transit Project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
8
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(8 citation statements)
references
References 2 publications
0
8
0
Order By: Relevance
“…Mousavi et al (2011) also developed a risk assessment model for highway projects using the jackknife technique. In addition, the use of the ANP to evaluate risk has been practiced by Tang et al (2011) on urban rail transit projects in China and by Valipour et al (2013) on a gas refinery EPC in Iran. Yu and Lee (2012) also proposed a conflict-risk assessment model for an urban regeneration project based on the fuzzy-failure mode and effect analysis (Fuzzy-FMEA).…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Mousavi et al (2011) also developed a risk assessment model for highway projects using the jackknife technique. In addition, the use of the ANP to evaluate risk has been practiced by Tang et al (2011) on urban rail transit projects in China and by Valipour et al (2013) on a gas refinery EPC in Iran. Yu and Lee (2012) also proposed a conflict-risk assessment model for an urban regeneration project based on the fuzzy-failure mode and effect analysis (Fuzzy-FMEA).…”
Section: Literature Reviewmentioning
confidence: 99%
“…All above introduced along with a number of other examples indicate that lack of evaluating relationships and feedback among risks on project objectives is one of the reasons behind the weak accuracy of risk assessment and risk analysis of construction projects and PPP projects (Nasirzadeh et al 2008;Tang et al 2011;Peckiene et al 2013;Turskis et al 2012). To support this, Zegordi et al (2012) developed a FANP-TOPSIS method for the risk assessment of EPC power plant project risks in Iran focusing on dependency and feedback among different criteria for risk assessment such as probability and impact.…”
Section: Literature Reviewmentioning
confidence: 99%
“…An analytic network process (ANP) technique to evaluate risk was used by Tang et al (2011) for Chinese urban rail transit projects and by Alireza et al (2013) for a gas refinery engineeringprocurement-construction (EPC) project in Iran. Yu and Lee (2012) used a conflict-risk assessment technique for an urban renewal project based on the fuzzy failure mode (Fuzzy-FMEA).…”
Section: Reviews Of Multi-attribute Decision-making (Madm) Techniquesmentioning
confidence: 99%
“…These techniques are combined with fuzzy set theory (FST) to address the uncertainty and imprecision of input data as well as the subjectivity of experts to rank project risks. Fuzzy ANP was used to establish a risk evaluation system for the urban rail project in China (Tang et al, 2011) and develop a risk assessment methodology to address the MCDM project evaluation challenges (Yazdani et al, 2019).…”
Section: Introductionmentioning
confidence: 99%