2023
DOI: 10.1177/03611981231211321
|View full text |Cite
|
Sign up to set email alerts
|

Research on Vehicle Scheduling Optimization Model of Precast Concrete Components Considering Carbon Emission Cost

Zhenghua Cheng,
Shuo Chen,
Qiu Xie
et al.

Abstract: The distribution of precast concrete (PC) components has the characteristics of high time penalty costs, transportation costs, long-term accumulated carbon emission, and long unloading waiting time. These characteristics result in increased distribution costs. Aiming at this problem, the vehicle scheduling (VS) optimization model was proposed to minimize total distribution costs, including transportation costs, unloading waiting costs, carbon emissions costs, and so forth. The proposed model was solved using t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 31 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?