Resource scheduling and planning for tunneling with a new resource model of the Decision Aids for Tunneling (DAT)

Abstract: 11Resource scheduling and planning are the strategies required to determine the sequence of

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
4
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 24 publications
(4 citation statements)
references
References 17 publications
0
4
0
Order By: Relevance
“…Liu et al [35] proposed a "collapse warning value" for soft rock tunnel construction according to relevant regulations, engineering experience, and field monitoring to guarantee the safety of the construction area. Min and Einstein [36] utilized tunnel engineering risk management to assist decision-making systems in simulating resource scheduling and planning through tunnel construction. By formulating varying tunnel construction strategies, they achieved optimization of the construction process, considering events, costs, and resources.…”
Section: Construction Safety Risk Assessmentmentioning
confidence: 99%
“…Liu et al [35] proposed a "collapse warning value" for soft rock tunnel construction according to relevant regulations, engineering experience, and field monitoring to guarantee the safety of the construction area. Min and Einstein [36] utilized tunnel engineering risk management to assist decision-making systems in simulating resource scheduling and planning through tunnel construction. By formulating varying tunnel construction strategies, they achieved optimization of the construction process, considering events, costs, and resources.…”
Section: Construction Safety Risk Assessmentmentioning
confidence: 99%
“…Chronographic modeling proposes an internal division of activities related to internal or external scales [8]. External and internal scales can be vertical or horizontal to designate the measuring unit of the orthogonal axis system (Fig.…”
Section: B Attribute By Scalementioning
confidence: 99%
“…Using simulation techniques, Chen et al [7] proposed an intelligent scheduling system (ISS) to distribute resources and assign different levels of priorities to different activities. Min and Einstein [8] employed simulation techniques to resource/space availability to develop a resource model applicable in Tunnel construction. Siu et al [9] proposed resourcebased scheduling as a solution to the supply-demand matching problem.…”
mentioning
confidence: 99%
“…Arsalan Mahmoodzadeh et al 40 have been developed hybrid algorithms to predict Mode-I rock fracture toughness and fivefold cross-validation was applied. Besides, researchers also proposed different approaches to forecast the construction time and costs of tunneling projects, such as statistical methods 41 44 , fault tree or event tree analysis, decision trees or risk matrixes 45 – 47 . Arsalan Mahmoodzadeh et al 48 using four machine learning methods including the linear regression (LR), Gaussian process regression (GPR), support vector regression (SVR), and decision tree (DT) with the grey wolf optimization (GWO) algorithm was used to fine-tune the models' hyper-parameters to predict geology, duration, and costs of tunnels construction.…”
Section: Introductionmentioning
confidence: 99%