2020
DOI: 10.1088/1742-6596/1569/3/032022
|View full text |Cite
|
Sign up to set email alerts
|

Rework Reduction and Quality Cost Analysis of Furniture Production Processes Using the House of Risk (HOR)

Abstract: Quality is one of the important factors that makes a company survive in the industrial world. PT. X maintains the quality of its products by conducting quality tests on all products that will be sent to consumers. Although the quality test has been carried out on products, there are still consumers who receive defective products. To reduce product defects, a risk management approach is carried out. Risk management is a method in which organizations can identify problems with a comprehensive and systematic mana… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
2

Year Published

2021
2021
2022
2022

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 19 publications
0
2
0
2
Order By: Relevance
“…The data collection of this research used interviews and questionnaires with data processing which was divided into 2 steps, the first using the HOR method and the second using the SWOT method. [10] The House of risk method in this study will be used as a risk identification tool to get a risk agent who has the greatest potential in causing risk. In determining the risk source to be selected, it will be based on the determination of the ARP value rating which is influenced by the severity, occurrence, and correlation of risk events and risk agents.…”
Section: Methodsmentioning
confidence: 99%
“…The data collection of this research used interviews and questionnaires with data processing which was divided into 2 steps, the first using the HOR method and the second using the SWOT method. [10] The House of risk method in this study will be used as a risk identification tool to get a risk agent who has the greatest potential in causing risk. In determining the risk source to be selected, it will be based on the determination of the ARP value rating which is influenced by the severity, occurrence, and correlation of risk events and risk agents.…”
Section: Methodsmentioning
confidence: 99%
“…Hal ini perlu diteliti lebih lanjut untuk dapat mengetahui nilai Defect Per Million Opportunity (DPMO) dan level sigma serta mengimplementasikan upaya perbaikan untuk dapat meminimalkan rework dan biaya kualitas dengan meningkatkan kualitas. Penilaian dari cost of quality menjadi prioritas dengan melakukan identifikasi pada risiko pemborosan dan meminimalkan rework (Auliandri & Alfiani, 2018;Kurnia et al, 2022;Winarso & Jufriyanto, 2020).…”
Section: Gambar 1 Jumlah Penumpang Kereta Api Indonesiaunclassified
“…The HOR approach aims to identify risks (Hadi et al, 2020). Regarding the sources of production risk, market risk, institutional risk, human risk, and financial risk they face in oil palm cultivation (Winarso & Jufriyanto, 2020).…”
Section: Identify Risk Factorsmentioning
confidence: 99%