2011
DOI: 10.5296/jmr.v4i1.979
|View full text |Cite
|
Sign up to set email alerts
|

Risk Analysis for Critical Infrastructures Using Fuzzy TOPSIS

Abstract: Critical infrastructures are the most important sector in countries because of the essentiality of nation security, public safety, socioeconomic security, and way of life. According to the importance of infrastructures, it is a necessity to analyze the potential risks to do not allow these risks convert into events. The main purpose of this paper is to provide a developed framework with the aim to overcome limitations of the classical approach to build a more secure, safer, and more resilient critical infrastr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2015
2015
2018
2018

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 17 publications
(9 citation statements)
references
References 26 publications
0
9
0
Order By: Relevance
“…High importance of project selection in the project life cycle while solving bid/no-bid problems, especially in the construction industry, have been analysed by Abbasianjahromi and Rajaie (2012). Risk can be analysed with the help of the following methods: based on fuzzy TOPSIS bid/no-bid model (Ravanshadnia, Rajaie 2013); in fuzzy environment, applying TOPSIS-F method (Tamošaitienė et al 2013); based on intelligent agents (Smeureanu et al 2012); RAMCAP (Risk Analysis and Management for Critical Asset Protection) by introducing new parameters that affect risk value (Yazdani et al 2011);and Fuzzy Synthetic Model (Abdul-Rahman et al 2013). In terms of risk management, it is important to consider the following issues:…”
Section: Review Of Risk In Construction Industrymentioning
confidence: 99%
“…High importance of project selection in the project life cycle while solving bid/no-bid problems, especially in the construction industry, have been analysed by Abbasianjahromi and Rajaie (2012). Risk can be analysed with the help of the following methods: based on fuzzy TOPSIS bid/no-bid model (Ravanshadnia, Rajaie 2013); in fuzzy environment, applying TOPSIS-F method (Tamošaitienė et al 2013); based on intelligent agents (Smeureanu et al 2012); RAMCAP (Risk Analysis and Management for Critical Asset Protection) by introducing new parameters that affect risk value (Yazdani et al 2011);and Fuzzy Synthetic Model (Abdul-Rahman et al 2013). In terms of risk management, it is important to consider the following issues:…”
Section: Review Of Risk In Construction Industrymentioning
confidence: 99%
“…TOPSIS is criticized due to its neglect of uncertainty and excessive subjectivity in setting weights (Yazdani, Alidoosti, & Basiri, ). Therefore, the fuzzy TOPSIS with linguistic assessments has been developed to model the uncertainty and address situations that are too complex or not well‐defined enough (Yazdani et al., ; Yeh & Chang, ). As such, the fuzzy TOPSIS or related techniques should also be considered for further experiments.…”
Section: Limitations and Further Studiesmentioning
confidence: 99%
“…Another study by Yazdani et al, (2012) identified the risk criteria and used Fuzzy TOPSIS as an uncertainty-based multi-criteria decision-making technique to determine the weights of each criterion and the importance of investment alternatives with respect to the risk criteria. This framework extends the Risk Analysis and Management for Critical Infrastructure Protection (RAMCAP) method by introducing new parameters to assess the effects on risk value.…”
Section: Risk = Threat • Infrastructure Vulnerability or Resilience •mentioning
confidence: 99%