Risk analysis of toll road construction project by using soft system methodology (ssm) a case study of Sumatera trans toll road section 1 Bakauheni – Kalianda

Abstract: Toll construction project never loses its touch of various kinds of trouble well as well as a problem as well as technical and non-technical matters. This energy problem occurred as a result of various factors that are considered to be as to risk a construction project.risk the loan would also be a great deal to perform and leaving close to lose in case the cost of, improvement in the quality of, and time, determine the success of a different project it was. For that reason it is, objectives of the study are t… Show more