2021
DOI: 10.1061/(asce)co.1943-7862.0002159
|View full text |Cite
|
Sign up to set email alerts
|

Risk-Based Approach to Predict the Cost Performance of Modularization in Construction Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 13 publications
(5 citation statements)
references
References 54 publications
0
4
0
1
Order By: Relevance
“…This is likely to be especially low in developing countries where new technologies such as BIM and may not be readily available (Olawumi and Chan, 2019). The significant positive correlations between delivery time and all project performance variables highlight the importance of project logistics management, a subject which has received scant attention in construction management and which is likely to be particularly crucial as construction modularises and problematic in developing countries with poor transport infrastructure (Abdul Nabi and El-adaway, 2021).…”
Section: Discussion Of the Resultsmentioning
confidence: 99%
“…This is likely to be especially low in developing countries where new technologies such as BIM and may not be readily available (Olawumi and Chan, 2019). The significant positive correlations between delivery time and all project performance variables highlight the importance of project logistics management, a subject which has received scant attention in construction management and which is likely to be particularly crucial as construction modularises and problematic in developing countries with poor transport infrastructure (Abdul Nabi and El-adaway, 2021).…”
Section: Discussion Of the Resultsmentioning
confidence: 99%
“…The Modern Methods of Construction (MMC) minimises onsite activities by shifting fundamental costly and time-consuming construction practices offsite. In turn, it positively influences projects' quality, safety, and productivity (Arif and Egbu, 2010;Abdul Nabi and El-adaway, 2021;Iacovidou et al, 2021). However, the uptake of such methods is still very primitive worldwide (Taylor, 2020).…”
Section: The Innovation: Modern Methods Of Constructionmentioning
confidence: 99%
“…Scholars from around the world have identified and addressed the challenges associated with PC, endeavoring to enhance its implementation in the AEC industry. Their collective efforts have focused on resolving a wide range of challenges, including health and safety problems [12,[14][15][16][17][18][19][20][21][22]; supply chain and supply chain resilience problems [5,[23][24][25][26][27][28][29][30][31]; logistical problems [32,33]; schedule and delay problems [34][35][36][37][38][39]; information technology problems [40]; modular elements' tolerance problems [41,42]; problems related with crane operations [43]; problems related with policy drivers [30]; design problems [44,45]; quality problems [46]; and investment and cost problems [10,[47][48][49][50][51][52].…”
Section: Existing Studies On Pcmentioning
confidence: 99%