2018
DOI: 10.1016/j.strusafe.2018.06.005
|View full text |Cite
|
Sign up to set email alerts
|

Risk-based target reliability indices for quay walls

Abstract: Design codes and standards rely on generalised target reliability indices. It is unclear, however, whether these indices are applicable to the specific risk-profile of marine structures. In this study, target reliability indices for quay walls were derived from various risk acceptance criteria, such as economic optimisation, individual risk (IR), societal risk (SR), the life quality index (LQI) and the social and environmental repercussion index (SERI). Important stochastic design variables in quay wall design… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
19
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
4
4

Relationship

1
7

Authors

Journals

citations
Cited by 21 publications
(19 citation statements)
references
References 30 publications
0
19
0
Order By: Relevance
“…If the reliability of dikes is changing significantly in time, one also has to consider reinvestments. However, due to the dependence of slope stability reliability on time-independent ground-related uncertainty, slope stability of dikes (and other geotechnical structures, see e.g., Roubos et al (2018)) is typically rather time independent. Therefore, in an economic optimization one can estimate the annual target reliability by considering an infinite time horizon, such that the optimal level of protection b T , follows from the following minimization:…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…If the reliability of dikes is changing significantly in time, one also has to consider reinvestments. However, due to the dependence of slope stability reliability on time-independent ground-related uncertainty, slope stability of dikes (and other geotechnical structures, see e.g., Roubos et al (2018)) is typically rather time independent. Therefore, in an economic optimization one can estimate the annual target reliability by considering an infinite time horizon, such that the optimal level of protection b T , follows from the following minimization:…”
Section: Methodsmentioning
confidence: 99%
“…A reference period of 1 year is assumed, in line with common practice for flood defence structures. It should be noted that in some cases for geotechnical structures, the use of other reference periods might be more adequate (Roubos et al, 2018), and for instance the time factors provided in Diamantidis et al (2019) may be applied. The cost of the reference strategy without monitoring and proof loading is defined as c 0 : The Value of Information (VoI) of a strategy fp,m,dg can be computed by:…”
Section: Framework To Support Decision-making Towards Efficient Utilimentioning
confidence: 99%
See 1 more Smart Citation
“…(1) breakwater design (Koc 2009), (2) quay wall design (Roubos et al 2018), (3) land reclamation (Lendering et al 2015), and (4) dredging (Nebot et al 2017). When conducting a literature review on peer-reviewed research containing checklists that can be used in risk identification for construction projects, it appears that publications can be categorized as follows:…”
Section: Published Research On Construction Project Risksmentioning
confidence: 99%
“…The units and parts of modules limiting reliability are used for the assessment of reliability. Alfred [18] developed a method to determine the influence of time-independent variables on the development of failure probability over time. This method can be also used to evaluate target reliability indices of other civil and geotechnical structures.…”
Section: The Connotation Definition and Literature Analysis About Conmentioning
confidence: 99%