“…The cost overrun causes previously identified in Table 1 have been analyzed to rank the top five cost overrun causes based on the number of studies that cited these factors as the critical factors that lead to cost overrun. [40], [15], [41], [42], [43], [44], [45], [46], [47], [48], [49], [50], [51], [52], [53], [20], [54], [14], [55], [56], , [57], [58], [59], [60], [59], [61], [25] [62], [10], [63], [64], [65], [65], [66], [67], [11], [12], [68], [69], [70], [71], [72] [41], [15], [78], [79], [80], [81], [44], [47], [48],…”