2022
DOI: 10.1007/s00769-022-01521-y
|View full text |Cite
|
Sign up to set email alerts
|

Risk management approach for testing and calibration laboratories

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 7 publications
0
2
0
1
Order By: Relevance
“…In this paper, we develop the information system using the waterfall software development method, which is a systematic approach, starting from the system requirements stage and moving on to the analysis, design, coding, testing/verification, and maintenance stages [4]. To construct the information system, we implement the waterfall model as a compound of activities into linear sequential phases, meaning they are passed down onto each other, where each stage depends on the deliverables of the previous one and corresponds to a specialization of tasks.…”
Section: Proposed Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…In this paper, we develop the information system using the waterfall software development method, which is a systematic approach, starting from the system requirements stage and moving on to the analysis, design, coding, testing/verification, and maintenance stages [4]. To construct the information system, we implement the waterfall model as a compound of activities into linear sequential phases, meaning they are passed down onto each other, where each stage depends on the deliverables of the previous one and corresponds to a specialization of tasks.…”
Section: Proposed Methodsmentioning
confidence: 99%
“…Although the new version introduces the idea, procedures to be adopted for implementing risk management in testing and calibration laboratories are not addressed. The article is conceptual and summarizes information from the literature to assess the application of reputable risk management models and implement them in laboratories [4].…”
Section: Introductionmentioning
confidence: 99%
“…Однако в стандарте отсутствуют какие-либо требования к использованию формальных методов управления рисками или документированного процесса управления рисками. Лаборатории могут сами решить, следует ли им разрабатывать более обширную ме-тодологию управления рисками, например, путем применения другого стандарта [1].…”
Section: Introductionunclassified