Risk Modelling with Bayesian Networks - Case Study: Construction of Tunnel under the Dead Vistula River in Gdansk

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
11
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
7
1

Relationship

3
5

Authors

Journals

citations
Cited by 20 publications
(12 citation statements)
references
References 4 publications
0
11
0
Order By: Relevance
“…The project performance is mainly influenced by managerial effectiveness and sophistication of the client and their representatives in terms of creating and maintaining positive project team relationships between contractor and design teams [8]. Shortage of skilled project managers emerges as the root cause for time and cost overruns in a project lifecycle [5]. cost overrun are fuelled by frequent changes in design and weak procurement planning, which can be mitigated by adequate training and coaching of project managers [5].…”
Section: Cost Overrun In Construction Industrymentioning
confidence: 99%
See 1 more Smart Citation
“…The project performance is mainly influenced by managerial effectiveness and sophistication of the client and their representatives in terms of creating and maintaining positive project team relationships between contractor and design teams [8]. Shortage of skilled project managers emerges as the root cause for time and cost overruns in a project lifecycle [5]. cost overrun are fuelled by frequent changes in design and weak procurement planning, which can be mitigated by adequate training and coaching of project managers [5].…”
Section: Cost Overrun In Construction Industrymentioning
confidence: 99%
“…Shortage of skilled project managers emerges as the root cause for time and cost overruns in a project lifecycle [5]. cost overrun are fuelled by frequent changes in design and weak procurement planning, which can be mitigated by adequate training and coaching of project managers [5]. As a result cost uncertainty analysis is an important feature of cost estimation that helps decision makers to understand not only the potential funding exposure but also the nature of risks for a particular project or program [10].…”
Section: Cost Overrun In Construction Industrymentioning
confidence: 99%
“…The literature review allowed to identify factors that in the opinion of many researchers, have a significant impact on the increase of costs and duration of construction investments. Most of the mentioned studies refer to the scale of implemented investments, not their specificity [16,17,18].…”
Section: The Specificity Of Construction Projects Carried Out In Histmentioning
confidence: 99%
“…The Bayesian framework was applied in both steps and the improvements in the results were discussed. Another application of BNs was presented in [14] and it demonstrates how Bayesian belief networks (BBNs) can be used as a diagnostic-decision support model (D-DSM) during the implementation phase of a large construction project. The example concerns a road tunnel and demonstrates how the D-DSM can combine expert knowledge with the monitoring information.…”
Section: Introductionmentioning
confidence: 99%