2021
DOI: 10.1002/mcda.1776
|View full text |Cite
|
Sign up to set email alerts
|

Risk prioritisation using fuzzy analytic network process: A case of Addis–Djibouti railway construction project

Abstract: The purpose of this paper is to develop a risk assessment model to prioritise the risks of railway construction projects. A fuzzy analytic network process (FANP) is employed to rank project risks based on the likelihood of project risks and their impact on cost and time. Fuzzy set theory is used to represent the vagueness in each expert's judgment, while ANP is used to deal with interdependence and feedback effects of risks. The data for this study was collected through literature reviews, interviews, and ques… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 34 publications
0
1
0
Order By: Relevance
“…Because of the capability of quantifying the subjective criteria, examining difficult decisions under uncertainty, and simplicity, these techniques are used in many research papers in a wide variety of fields. For example, AHP and ANP models are applied in construction project (Gashaw & Jilcha, 2022), financial investment (Çalık et al, 2019), location problem (Bottero & Ferretti, 2011), supplier selection (Kasirian et al, 2013), scheduling (Momoh & Zhu, 2003), performance indicator selection in the healthcare sector (Khan et al, 2022; Moons et al, 2019), deciding on copyrights on the Internet (Andreichicova & Andreichicov, 2012), and industry 4.0 implementation (Nimawat & Gidwani, 2021). Due to their applicability in variety of areas, some studies have proposed the algorithms to ease the process of the AHP and ANP structure design (e.g., Ergu et al, 2011; Khademi et al, 2012).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Because of the capability of quantifying the subjective criteria, examining difficult decisions under uncertainty, and simplicity, these techniques are used in many research papers in a wide variety of fields. For example, AHP and ANP models are applied in construction project (Gashaw & Jilcha, 2022), financial investment (Çalık et al, 2019), location problem (Bottero & Ferretti, 2011), supplier selection (Kasirian et al, 2013), scheduling (Momoh & Zhu, 2003), performance indicator selection in the healthcare sector (Khan et al, 2022; Moons et al, 2019), deciding on copyrights on the Internet (Andreichicova & Andreichicov, 2012), and industry 4.0 implementation (Nimawat & Gidwani, 2021). Due to their applicability in variety of areas, some studies have proposed the algorithms to ease the process of the AHP and ANP structure design (e.g., Ergu et al, 2011; Khademi et al, 2012).…”
Section: Literature Reviewmentioning
confidence: 99%