2001
DOI: 10.2172/877094
|View full text |Cite
|
Sign up to set email alerts
|

Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
10
0

Year Published

2001
2001
2007
2007

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(10 citation statements)
references
References 9 publications
0
10
0
Order By: Relevance
“…Data for the solubility of BOBCalixC6 acquired and reported for the Salt Processing Program (SPP) alternative technology down-select decision showed the above composition is supersaturated with respect to BOBCalixC6 [11]. Although samples of the baseline solvent have been observed for approximately one year without any solids formation, the CSSX technical team recommended a solvent-composition optimization task be undertaken to address the BOBCalixC6 solubility and other issues [19] such as third-phase formation, as a function of the plant operating temperature.…”
Section: Basis For Task and Summary Recommendationmentioning
confidence: 99%
See 2 more Smart Citations
“…Data for the solubility of BOBCalixC6 acquired and reported for the Salt Processing Program (SPP) alternative technology down-select decision showed the above composition is supersaturated with respect to BOBCalixC6 [11]. Although samples of the baseline solvent have been observed for approximately one year without any solids formation, the CSSX technical team recommended a solvent-composition optimization task be undertaken to address the BOBCalixC6 solubility and other issues [19] such as third-phase formation, as a function of the plant operating temperature.…”
Section: Basis For Task and Summary Recommendationmentioning
confidence: 99%
“…In 2001 the USDOE selected the CSSX process flowsheet as the preferred technology for this application [4,5] following an evaluation of alternative technologies [6][7][8][9][10]. This selection was largely founded on extensive testing and demonstration data that successfully addressed four high technology risks, including chemical stability [11], radiation stability [11][12][13][14][15], proofof-concept demonstration with waste simulant [15], and demonstration with actual SRS high-level waste [16].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Realizing these limitations, the Salt Processing Project initiated extensive research and development efforts to identify alternate process options with much work scheduled in fiscal year 2002. 2 One process alternative uses the addition of sodium permanganate and non-radioactive strontium nitrate to replace MST. Prior research proves this process effective in the treatment of waste from the Hanford, Washington, site.…”
Section: Introductionmentioning
confidence: 99%
“…The overall SPP encompasses the selection, design, construction, and operation of facilities to treat the soluble HLW. 1 Following treatment, the decontaminated liquid would go to the site's Saltstone Facility, and the sludge would go to a borosilicate-based vitrification facility known as the Defense Waste…”
Section: Introductionmentioning
confidence: 99%